For the erection of any building you need a foundation. Often during the construction of the foundation, formwork is not removable. This technology is universal, as the risk of poor-quality building construction is reduced by several times. In addition, the installation of the base is greatly facilitated.

non-removable formwork for foundation
You can make this design andpersonally, but first of all, it is necessary to understand the advantages and disadvantages of such technology. Its main advantage is the shortening of the construction time. Fixed formwork foundation is going right into the trench, especially since then it does not need to be dismantled. In addition, the formwork can be purchased in a ready-made form. Also it should be noted fire safety, resistance to seismic activity, low weight, moisture, heat and waterproofing of a similar design. The load on the base in this case is minimal.

fixed foundation
Fixed formwork for the foundation has onlyone drawback is that you can not reuse already used blocks. They forever remain an element of foundation. For the manufacture of a structure, materials such as fibrolite, cement or expanded polystyrene blocks are usually taken. Moreover, the latter option is classical. In addition, it does not interfere with the ventilation of the substrate.

Fixed formwork for foundation is easyis established, the only thing you should not do is hurry. All work should be carried out according to plan. If you are planning to equip a strip foundation, the structure should be installed on a base covered with a layer of waterproofing. The blocks must be mounted in reinforcing bars. Since they are equipped with special grooves, the metal in them will easily enter.

Fixed formwork for the foundation is constructed ofseveral layers of blocks. The first of these is the most important and is responsible for the correct formation of the base. After you have successfully laid three layers, you should start pouring the grout. When installing the formwork, you immediately mark out where the doors, slopes, and other elements will be mounted. In order for the mixture to lie flat, it should be sealed with a deep-seated vibrator.

fixed formwork
Fixed formwork for the foundation providesincomplete filling of the last row of blocks. It is desirable to cover it with a mixture of only 60%. The walls will be much stronger if the seams of monolithic concrete will be located inside the blocks. At the same time, care should be taken to arrange ventilation and other communications. To do this, the blocks mark the exit points of the pipes and make corresponding holes in accordance with the plan.

In appearance, the finished formwork resemblesSandwich, inside of which there are polystyrene sheets. It is also necessary to take care of the armature in advance, because otherwise the stability of the base will be under threat.

That's all. The equipment of fixed formwork is a simple task, which, however, requires attention, patience and certain skills. But if you are not confident in your abilities, then it is better to entrust this work to a more experienced master.