How to make a gate with electric drive? Step-by-step installation and photo
It is possible to create a gate with electric drive independently. However, this process can not be called simple, it assumes the existence of certain knowledge and skills.
Features of the automation system
Such work is carried out onthe final stage, if this option is assumed to be a design. Moving the gate leaf will be carried out by means of rack gears, they are sold by the meter together with the fastening systems. Reiki are fixed to the bearing profile. If you decide to install a sliding gate with an electric drive, then you need to remember that in addition to the rack gears, you need a console, an electric wire, a key, and a beacon lamp. All will be installed in accordance with the requirements prescribed in the instructions.
Initially, you need to choose a place for installationelectric drive. It will need the installation base that goes in the kit. The drive is located on it. After the system should be fixed to the channel between the carriages.
When the gates are reclined withthe next step is to configure the automation, setting it in the working position to determine the location of the drive. The electric drive must be on the rack with the teeth, it is important to ensure that these elements are in the central part of the gear and fixed on the profile pipe at the location of the outer frame.
After the place is determined, it isyou need to lay the rest of the equipment for installation, and then walk through the perimeter welding. In some cases, there is a need to lift the drive a few centimeters higher. To do this, use a profile pipe, to which the drive is welded. When choosing a pipe, the following dimensions should be used: 40 x 20, 50 x 50, 60 x 30. Once the channel is installed on the mounting base, the electric drive should be fixed to it with the welding machine and then fixed using bolts.
Work on the rack
You, of course, can order a sliding gate withelectric drive on a turn-key basis. However, the cost of these works will be quite high. Independently to carry out such manipulations, although not so simple, but still possible. The next step is to take care of fixing the rack. The gate should be open at the same time, the rack with the pinion should be installed in the middle of the drive. To fix the limit switches, it is important to leave a little racks with teeth. The latter will need to be welded to the profile pipe. For the rail should pull the cloth. Once the next rack is in place, you need to follow the same procedure described above. Between the joints there should be no breaks. Each element of the gate automation must be welded again. Between the drive and the gear there should be a millimeter gap.
Technology of installation of limit switches
When the electric drive for slidinggate, it is necessary to fix the limit switches with bolts, by installing them on the end rail. Switches can have a magnetic or mechanical design. The first option will work even in the conditions of the lowest temperatures. On the rack the magnet is mounted, at the time of passage of a certain place the structure stops. Switches must be divided into right and left. Specialists recommend setting and installation of magnetic switches, deviating one meter or more from them. Installation of mechanical limit switches is quite simple. They work on the basis of a spring.
Preparing to install the gate
If you decide to install a sliding gate withelectric drive, the foundation will first need to be poured, this is the preparatory stage. You should begin this work by marking the location of the trench. The width of the base of the gate should be equal to the limit of 50 centimeters. Determining the depth of the pit, it is important to take into account the freezing line of the soil. If it is a question of Moscow suburbs, the foundation can be laid on 1.7 meters.
Gates recoiling with electric drive by one's own handscan be manufactured. The armature and the channel will become materials for the embedded element. The parts must be welded together. The channel is used to increase the rigidity and strength of the substrate. If you connect the vertical bars with webs, you will get a fairly strong frame. He is lowered into a trench, and then the foundation is poured. Preliminary to the bottom should be poured sand, which is well tamped.
Before pouring the foundation it will be necessaryCheck how horizontally the reinforcement is positioned. To do this, use the building level. In the alignment process, care must be taken to ensure that the longitudinal axis of the channel is parallel to the fence line. If you plan to use a sliding gate with an electric drive, then during the pouring of the foundation it is necessary to lay the wires, hiding them in the corrugated tubes. The point of exit by a bundle of wires should be chosen, taking into account the planned location of the electric drive. Most often the equipment is installed in the center of the foundation.
Installation work
The line of motion of the structure must be definedthe method stretched along the opening of the cord, it should be located, deviating from the surface of the road 200 millimeters. On the rope to align the position of the beam, which serves as a supporting profile. It will be necessary to prepare roller trolleys for installation, assembling them in series inside the bearing beam. Trolleys should be moved to the central part of the gate. The leaf must be placed on the steel channel of the embedded structure, and afterwards the supports should be placed in series in different places.
Fixing of roller trolleys
How to connect the drivesliding gates, was described above. However, in the next step it is necessary to fasten the roller trolleys. The adjustment platform should be welded to the channel. The gates roll out into the opening to the end, which will allow you to check the horizontality of the canvas. The adjustment pad is welded. The web should be removed from the roller supports, which are removed from the adjustment pads. On the contour you will need to go through welding, welding the pad to the embedded elements. Roller bearings must be fixed on the adjustment platform. The gate should be installed in the closed position, which will allow to adjust the horizontal position of their position in relation to the bearing profile. To do this, use a spanner to lower or raise the platforms relative to each other.
Free wheel adjustment
The upper nuts must be loosened in order toadjust the position of the roller bearings. The gate must be opened and closed, rolling them from one end to the other. Roller bearings will take the correct position in which the structure will move freely and easily. After adjustment is complete, tighten the upper nuts of the roller bearings.
Installation of plugs and end roller
How to mount a sliding motor drivegate, you will find out if you read the information provided above. However, it is important to know also how the end roller is installed. At the next stage, you can do this work. To do this, install the end roller inside the U-shaped profile, placing it on the front side of the gate. You can fix the part with mounting bolts. In the set of sliding gates there should be a plug of the bearing profile, it is welded from the rear side. This part does not allow the carrier profile to be clogged with snow, which eliminates the possibility of jamming the device.
In order to mount the upper guidebracket, it is necessary to loosen the clips of the rollers. After the bracket should be placed above the blade so that the rollers touch the upper edge, the side with the holes should be directed towards the support.
Conclusion
Use the design more comfortablythe electric drive. Sliding gates, the installation of which you can be made by yourself, in the next stage involves the sheathing of the sheet with a profiled sheet. Initially, the material will need to be cut in width and height, giving the canvas the right size.