How much cement is in 1 cube of solution? Composition, proportions, instruction
Cement solution can be considered the mostpopular and popular material in modern construction. Its strength characteristics will depend on the quality and the ratio of the ingredients used. Proportions and composition are determined by the destination area. Most often, concrete is used to build foundations. On how correctly it will be possible to determine the required amount of building materials, the rate of construction will depend. And if the calculation of the required volume of bricks, as a rule, does not cause difficulties, then the determination of the consumption of cement, which goes to 1 cubic meter of solution, can create some difficulties.
What influences the volume of cement when preparing a solution cube?
Selecting the composition of the mixture, it is necessary to remember,that when the cement grade is increased, the need for using a binder will be reduced. In some cases, in order to preserve the structure of the mixture after setting, stone dust is added to it. In order to determine the question of how much cement in 1 cube of solution, it must be remembered that the consumption of this ingredient depends on the type of mixture. Depending on the purpose, clay, sand or lime solutions can be used. For each of these formulations, its filler-binder ratio is used. Thus, in order to obtain a solution of cement and sand, the components mentioned are taken in a ratio of 1: 3 or 1: 4. To obtain a lime mortar cement must be introduced in a ratio of 1 to 3 in relation to the limy component. When using clay, the volume of cement per 1 cubic meter of solution varies, with the ratio 1: 9 being used.
Cement consumption, depending on the brand of solution
The grade of the mixture determines the strength of the composition aftercongealing. This indicator is chosen depending on which structural element of the construction the solution will be used for. For example, for bearing walls and foundations, the strength of the masonry serves as the determining value. For this reason, it is recommended to use as strong as possible solutions. If you are wondering about how much cement is in 1 cube of solution, then you need to remember that for indoor walls it is permissible to use a mixture with a less impressive volume of cement. For plastering, solutions with a lower cement content can also be used.
Dependence of the brand of solution on the volume of cement
If you have a question about how muchcement in 1 cube of solution, it must be remembered that the grade of the solution depends on the volume of cement used. Thus, in order to obtain a solution of grade M10 cement for the said volume, 81 kg should be added. M25 will be obtained if you add 133 kg of binder. For M50 it is necessary to prepare 178 kg, whereas for M75 - 245 kg. If you have a question about how much cement in 1 cube of a solution of mark M100, it is worth noting that you need to use these ingredients in a volume equal to 306 kilograms. For the highest grades M150 and M200, it is necessary to add cement in the amount of 414 and 510 kilograms, respectively. After you know how much cement you need for 1 cube of solution, you can start acquiring the components to carry out the work.
How much cement should I add to the 1 cc solution?
It will be fairly easy for the master to determine how muchyou need cement for 1 cube of solution. For this, it is necessary to take as a basis a certain ratio of filler and binder, as well as the density of cement. The last figure is 1,300 kilograms per cubic meter. If the proportion of cement and aggregate is 1 to 4, 20% of the binder will be used. Taking into account the density, the consumption of this ingredient per cubic meter will be: 1300/5 = 260 kilograms. When you visit the store you will have to purchase 6 bags, since you will need 5 bags with a small one. Calculate the amount of binder, so you can always do it yourself.
Cooking Instructions
After you know how much you needcement for 1 cube of a solution, it is possible to pass to a theoretical question, namely to acquaintance with technology of preparation. The mortar should be kneaded using a concrete mixer, in a metal bath or in a wooden box, depending on what equipment you have available. For the beginning it is necessary to mix dry components, among which gravel, sand and cement. After all the ingredients are well mixed, you can start adding water. Do not stop mixing. Pouring of concrete should be completed within 2 hours after the preparation of the composition. As soon as the base is filled, care should be taken to remove excess air bubbles using a deep vibrator.
Additional recommendations
After you have decided how much you needcement for 1 cube of solution, you can start to prepare the necessary inventory and materials. Pouring should be carried out in the warm season. However, if it is necessary to carry out manipulations at minus temperatures, then it is possible to add special substances that promote the strength of concrete under difficult conditions.
However, the master must give an account of the fact thatunder weather conditions, which are characterized by a negative temperature, the work will be difficult. It is necessary to heat water, which will prevent the mixture from freezing. If the formation of ice is allowed, this may cause an increase in the volume of the solution, which, in turn, can lead to the destruction of the structure from the inside.
What volume of solution is obtained from a single bag of cement?
If you have 1 bag of cement in stock,how many cubes of solution will come out of it? With the use of such a volume, 0.24 cubic meters of a solution of sand and cement will be obtained, with the ratio of one to three being used. To the ingredients will need to add one part of the clay. Increase the volume of the solution to 0.25 cubic meters is obtained if you use cement grade M300. In the end, you can get a solution of the brand M75.
Conclusion
Work on the preparation of cementsolution should occur if proportions are observed. The correct ratio will give a qualitative composition, which will differ strength and frost resistance. It is important not only to properly prepare the mixture, following the technology, but also to follow the stage of hardening. In this case, the surface of the structure should be moistened, which is especially important in hot weather. In this case, you can cover the surface with a moist burlap.